Very practical overall wardrobe installation knowledge

[ Chinese wardrobe network ] As people's living standards continue to improve, everyone's understanding of the decoration has also reached a level. The overall wardrobe is also becoming an indispensable part of modern home decoration. The overall wardrobe is tailor-made, and environmentally friendly, fashionable, professional and other characteristics, will be destined to become a hot spot for household wardrobes in the next few years. Let me talk about the installation of the wardrobe:

Wardrobe collection

Standard wardrobe installation

The first step: cabinet installation

1. Pad the floor with a cloth, first assemble from the wide side panel at one end of the wall, and lay the wide side panel on the ground, keeping a distance of 700mm from the back wall. First, fill the three-in-one rubber plug plate flat on the cloth, check the hole spacing and the drawing, and install the three-in-one single-link. Focus on the product structure, all the fixed positions of the horizontal and vertical intersections are three-in-one connection, the three-in-one mast is mounted on the embedded part of the phase plate, and the depth of the rubber is applied to the lower part of the mast.

2. In principle, the assembly is carried out in the middle, and each of the plates is wrapped with a mast hole and an eccentric wheel hole, and the mast-mounted plate member is aligned with the mast on the corresponding plate member. Insert the hole into the hole, and see the mast head about 5mm from the eccentric wheel hole, then insert the eccentric into the hole. (When installing the eccentric, pay attention to the arrow on the surface of the eccentric to indicate the direction to the mast hole. ), turn clockwise and tighten so that the two intersecting plates can be tightly attached.

3. In the assembly process, the assembly is carried out with the face facing down and facing upwards. If there is a blank position in front of the cabinet body, the internal structure should be installed first, and the item below the height of the front left position should be placed on the bottom surface. (Generally use the cabinet footboard or the closing plate), then assemble the outer panel and finally install the cabinet foot.

Step 2: Backplane installation

1. After the cabinet body is assembled, draw the center line for the back panel assembly for the intersecting panels. There are two methods for fixing the backplane by the normal peripheral board: a. Half-slot; the half-slot means that a 7-shaped notch is opened on the inner side of the rear side of the peripheral board, and the backboard is placed on the half-slot and fixed by nails or wires. The b-shaped groove is formed by leaving a plurality of positions on the inner side of the rear side of the peripheral plate, and the back plate is inserted into the notch and clamped and fixed by both sides of the groove.

2. When assembling the backboard, the angle of the cabinet must be righted first. In the case where the ground level is relatively horizontal, the most common method is to use the steel ring to measure the diagonal of the cabinet. According to the drawing structure, put the backboard on the back of the cabinet (because the seam of the backboard will be docked to the corresponding centerline of the corresponding panel at the time of production), then insert the backboards on both sides into the back of the two sides. Inside the plate slot, place the middle back plate. Fix the center line according to the original backing plate, extend to the corresponding position on the back plate, and drill a hole in the back plate screw fixing position with a 3mm twist drill to prevent the screw from being installed. When the cabinet is broken. When the two backing plates are stitched together, a 3mm drill can be used to align the holes between the two backing plates, and then screwed between the two backs.

Automatical Screen Printing Machine

We provide various full automatical Screen Printing Machine for Plastics container, plastics bottles, Glass bottles, bottle caps, T-shirt , Cloth, Plastics bucket, soft tube, Label, PVC film, Stickers, Ribbon, webbing, Pen-rod, Meter etc. Widely used in the field of Plastics package, Electric, Wine and red wing package, gift, stationary, cosmetic, Garment, Paint etc .

Full automatic lable screen printing machine;

ContainerFull automatic Pen rod screen printing machinel ; Full automatic Glass bottles screen printer, Full automatic plastics bottle screen printer

Automatical Screen Printing Machine

Automatic Single Color Screen Printing Machine,Automatic Non-Woven Fabric Screen Printing Machine,Auto Printing Machine

KC Printing Machine (Group) Limited , http://www.kcautopm.com