Maintenance of temperature shock test chamber

Maintenance of temperature shock test chamber

Various temperature shock test chambers have different requirements in management and maintenance. Each instrument should have a dedicated person responsible for storage and maintenance, so that it is in good condition for standby. The purchase, unpacking, acceptance, installation, and commissioning of the instrument should be handled by a dedicated person, and the instrument account (including name, specifications, unit price, quantity) and instrument usage file (instrument performance, verification and maintenance, etc.) should be established

In order to avoid the contamination and erosion of the instrument by steam and corrosive gases, the precision analysis instrument room should be separated from the chemical processing room. Balances and other analyzers should be placed in a room that is protected against shock, sun, and corrosion. Larger instruments should be fixed in position, and should not be moved arbitrarily, and covered with cotton cloth. Small instruments should be stored in the instrument cabinet after use.

Regularly check the performance of the instrument. The temperature shock test box verifies the performance indicators and records the inspection results on the instrument file.

The temperature shock test chamber must be used in strict accordance with the operating procedures specified in the instruction manual of the analytical instrument. Irrelevant personnel are not allowed to arbitrarily turn the knob of the instrument, and may not arbitrarily disassemble or modify the analytical instrument. The accessories of the precision instrument should be properly kept It used.

Blister Packaging Machine

Blister Packaging Machine,Packaging Machine,Blister Pack Packaging,Automatic Blister Packing Machine

U-PAC CO.,LTD , https://www.upac-machinery.com